Mon to Fri, 9:00 to 18:00 ESTBid-week cover outside these hours by arrangementUnited States & United Kingdom(929) 654-0076quantx.estimation@gmail.com
QuantXEstimationRequest a Quote

Construction estimating services in the UK: UK estimates in UK units, rates and language.

Metric takeoffs priced at UK labour rates, written in British terminology, reported as an elemental breakdown or in your own format, and delivered in GBP.

What changes for UK work

Not a US estimate with the currency changed

A US template converted to metric at the end still reads as a US document: the wrong sheet sizes behind the waste figures, the wrong words for the preliminaries, and a tax line that means something different.

UK packages are measured in metric from the start, with purchase units, sheet sizes and stock lengths set for the UK market. That matters most where waste is driven by what the material comes in, which is covered in waste factors by material.

Labour is still built from production rates in hours per unit, priced at UK wage levels, so a rate change is one edit. Site overheads are set out as preliminaries, post-contract changes are priced as variations on the same basis as the tender, and undefined work is carried as provisional sums with the basis stated.

If your cost plan follows an elemental structure, the estimate reports in it. If you work from your own template, send it and we build into that. See construction estimating methods for how elemental and trade estimates relate.

US term → UK term
UnitsMetric: m, m², m³, tonnes, nr
CurrencyGBP
Estimate structureElemental breakdown, CSI, or the client’s own cost plan format
Site overheadsPreliminaries
Changes after awardVariation
Work outside the buildingExternal works and groundworks
Interior partitionsDrylining
Money for undefined workProvisional sum
Tax on the priceVAT, normally excluded from tender prices

Full comparison on US and UK conventions.

UK examples

Packages priced for UK clients

Anonymised. Client names, project numbers and drawings are never published without written permission.

UK · London

Residential conversion, South-East London

UK ratesMetricConversion

Conversion of an existing property into self-contained units. Priced in metric with UK labour rates and British conventions, delivered in GBP rather than a US template with a currency conversion applied at the end.

Issued in the client’s own cost template
UK · London

Mixed-use development, central London

UKMulti-blockDeveloper

Estimating support for a London developer across a multi-block mixed-use scheme, with cost information structured for their internal reporting rather than an imported American format.

Reported in the client’s own elemental breakdown
Services

What UK clients most often ask for

Measurement

Sectors

UK questions

What UK clients ask first

Yes. UK projects are measured in metric with UK labour rates and British terminology, and delivered in GBP. They are not run through a US template and converted at the end.

Yes. Estimates can be structured as an elemental breakdown, in CSI divisions, or built into your own template. Send the format with the drawings and the numbers are reported in it from the start.

Published office hours are Mon to Fri, 9:00 to 18:00 EST, which is afternoon and evening in the UK. Drawings are shared by link and questions handled by email, so a set sent during the UK day can be measured the same day, and during bid week we keep overlap with your hours for questions.

Yes. UK examples include a residential conversion in South-East London and estimating support for a developer on a multi-block mixed-use scheme, reported in the client’s own elemental breakdown.

Send the drawings and your format.

A fixed fee, a firm delivery date and a written scope, with the numbers set out the way your cost plan or tender needs them.