Doors, windows & glazing estimating services
Doors, frames, hardware sets, windows, storefront and curtain wall counted against the schedule, unit by unit.
What a doors, windows & glazing package looks like.
Openings are a counting exercise where the count has to reconcile against three documents at once: the floor plans, the door schedule and the hardware schedule. Where they disagree, the disagreement is reported rather than resolved silently in our favour or yours.
Doors are counted by type, size, material and fire rating. Hardware is counted by set, because a single opening can carry anything from a passage latch to a full electrified set, and averaging across the schedule loses most of the money.
Measured in
What we look for specifically
- Plan count and door schedule disagreeing and nobody flagging it
- Hardware sets averaged rather than counted per opening
- Fire-rated assemblies priced as standard
- Storefront framing left out of an area-only measure
Doors, windows & glazing
- Doors by type, size, material and fire rating
- Frames by type, gauge and profile
- Hardware by set, itemised against the schedule
- Windows by unit, size and glazing specification
- Storefront and curtain wall by area with framing by linear foot
- Interior glazing, borrowed lights and partitions
- Automatic and revolving entrances
- Overhead, coiling and specialty doors
- Louvres, access panels and hatches
- Sealants, thresholds and weatherstripping
Turnaround
24 hours on most openings packages
Who it is for
Door and hardware suppliers, glazing contractors, general contractors and fit-out specialists.
Every doors, windows & glazing package ships the same four things.
Whatever the trade, the deliverable is consistent, so a package from us always drops into how you already work.
Excel workbook
Line-item detail with quantities, wastage, labour hours and material priced on separate columns.
Colour-marked sheets
Every measured item marked on the drawing with a count legend, so any figure can be checked against the plan.
Assumptions & exclusions
Written down, including anything the drawings did not answer, rather than absorbed into a rate.
Planswift source file
On request, so your team can re-measure a revision without coming back to us.
Common questions on doors, windows & glazing takeoffs.
It goes into the assumptions and exclusions list as a flagged discrepancy with both counts stated. Reconciling it silently would hide a real risk that belongs in an RFI before the bid goes out.
Yes, per opening against the hardware schedule. Hardware is frequently the larger half of an openings package and averaging it is where most of the error enters.
Packages that usually travel with this one.
Most enquiries cover more than one division. Bundling them into a single engagement keeps the assumptions consistent across the whole bid.
Send us one doors, windows & glazing package.
A fixed fee, a firm delivery date and a written scope statement, usually back the same working day. Judge us on the file that comes back.
CSI Division 08 · 24 hours on most openings packages · Unlimited revisions within scope


