Budget & preliminary estimating services

Order-of-magnitude and conceptual pricing from schematics, sketches or a written scope, for decisions taken before design is finished.

What it is

Budget & conceptual estimating

Early-stage numbers exist to answer a go or no-go question, secure funding or set a client expectation. They are built from square-foot and elemental models benchmarked against comparable completed work, not from a full measurement that the drawings cannot yet support.

The accuracy expectation for the design stage is always stated. Presenting a schematic-stage figure with the confidence of a construction-document estimate is how budgets get set badly, and it is the fastest way to lose a client relationship six months later.

Turnaround

1–3 working days

Who it is for

Developers, owners, architects and contractors taking feasibility or funding decisions.

What is included

Budget & conceptual estimating

  • Square-foot and elemental cost models
  • Benchmarking against comparable completed projects
  • Allowances stated openly rather than buried in rates
  • Design-development updates as drawings mature
  • Accuracy expectation stated for the design stage
  • Escalation and contingency guidance
What you receive

The deliverable.

Consistent whatever the engagement, so it drops into how you already work.

Elemental or square-foot budget workbook

Basis-of-estimate note covering what is included and assumed

Comparison against benchmark projects where relevant

Questions

Common questions on budget & conceptual estimating.

It depends entirely on how much design exists, which is why the expectation is stated on the document rather than implied. A concept-stage figure and a design-development figure are different products and should not be presented with the same confidence.

Yes. The less drawing information there is, the more the number depends on stated assumptions, and those assumptions are written down where you can see and challenge them.

Tell us what you need priced.

A fixed fee, a firm delivery date and a written scope statement, usually back the same working day.